JNOD Electric Boiler’s New Structure Revealed!

At JNOD, we are committed to continuous improvement and innovation in our electric boiler technology. Our latest inner structure design introduces several advancements significantly enhancing heating efficiency, maintenance ease, and overall performance. Here’s a closer look at the key improvements:

Enhanced Heating Efficiency with U-Type Heating Pipe

We have transitioned from an M-type to a U-type heating pipe, a change that optimizes the heating process. This new design allows for better heat transfer, which increases heating efficiency. Additionally, the enlarged water pipe reduces water resistance and enhances water flow, leading to a quicker heating response within the system. This means homeowners can enjoy faster access to hot water and improved comfort.

Electric Boiler heating pipe and water pie

Improved Circuitry with Enhanced Triac Configuration

Our electric boiler now features an upgraded configuration from three triacs to six triacs. This change minimizes the risk of current overload, reducing the likelihood of damage to individual triacs. We’ve also added a plastic cover to the PCB board, not only enhancing the aesthetic appeal but also providing better moisture resistance, which is crucial for longevity.

Electric Boiler PCB Board, Triacs

Optimized Wiring Space for Easier Installation

We’ve moved the terminals further to the left, allowing for more wiring space during installation and maintenance. This design tweak makes it easier for technicians to work on the boiler, reducing installation time and improving service efficiency.

Space-Saving Design for Enhanced Maintenance

The relocation of the inflatable port to the bottom of the unit simplifies after-sale maintenance. This design choice not only saves space but also makes it more convenient for technicians to access essential components during servicing.

Electric Boiler Change the Inflatable Port

User-Friendly Pump Plug Design

The pump’s U-shaped plug has been redesigned to move from a bottom connection to a side connection. This change greatly facilitates disassembly, making after-sales maintenance more straightforward and efficient for service teams.

Electric Boiler Changing the Pump's U-shaped Plug

Durable Stainless Steel Water Pipe Materials

We’ve upgraded our connecting water pipes from copper to stainless steel and increased their diameter. This transition not only enhances the durability of the system but also significantly increases water flow, ensuring a more efficient heating process.

Removable Metal Panel for Easier Access

The introduction of a removable metal panel further enhances maintenance capabilities. Technicians can now access internal components more easily, allowing for quicker repairs and servicing.

Electric Boiler Removable Metal Panel

Convenient Display Screen Placement

The display screen is now fixed inside the boiler, making it easier for after-sales teams to troubleshoot and address any issues. This strategic placement ensures that users can access operational information quickly while facilitating maintenance tasks.

Display Screen can be Fixed Inside the Boiler

Conclusion

With these enhancements, JNOD’s latest inner structure for the electric boiler not only improves efficiency and maintenance accessibility but also ensures a more robust and reliable performance. The thoughtful design changes reflect JNOD’s commitment to innovation and customer satisfaction. These advancements position the boiler as a more effective and user-friendly solution, promising a better experience for both installers and end-users.

Explore the benefits of JNOD’s latest electric boiler design today! Upgrade to improved efficiency and easier maintenance for a reliable heating solution. Contact us to learn more or schedule a consultation!

There are a total of 4 models electric boilers for the latest inneral structure as follows:

Scroll to Top